WHY NYC BUYERS SHOULD ASSESS APARTMENT RENOVATION FEASIBILITY BEFORE CLOSING


CONTENT PREPARED AND SERVICES PROVIDED BY FULL-SERVICE NYC-BASED ARCHITECTURAL PRACTICE LENKA ILIC ARCHITECTURE D.P.C.

NYC Apartment renovation feasibility should be assessed before closing when a NYC buyer intends to make significant alterations to a Co-Op or Condo. An Architect can review the proposed scope against Co-Op/Condo building rules, existing conditions, NYC Building Code requirements, likely approvals, projected cost and timeline before the purchase is completed.

What is apartment renovation feasibility study in NYC?

Buyers frequently evaluate an apartment based on what they believe they can change after closing, while renovation feasibility study is often left until after the transaction. For owners’ benefit, it would be wise to consult an architect to discuss their program to understand to which degree an anticipated renovation is feasible, what alternatives are available, and the cost and timeline implications.

A renovation feasibility study is an early form of pre-construction planning. Before design begins, the Architect can review the anticipated scope against the existing apartment, building rules, applicable code requirements, and known building systems to identify constraints that may materially affect the proposed renovation.

Apartment renovation feasibility study floor plan for a two-bedroom apartment on Chambers Street in Tribeca, color-coded zones for a converted bedroom and office, kitchen and bath relocation, a walk-in closet and a red note marking the window square footage calculation

Floor Plan Feasibility Study for a two-bedroom apartment in Tribeca, Lower Manhattan.

Co-op and Condo Renovation Rules and Limitations

Each building management has a unique approach to what rules are applicable to apartment renovations. It’s good practice that owners request an alteration agreement early on. “House rules” help assess what the limitations might be. Some building managements are able to provide information on the existing building conditions and system, which is very helpful.

Co-Op renovation rules can materially affect whether a proposed renovation is feasible. The building’s alteration agreement should therefore be reviewed together with the proposed scope rather than treated only as an approval requirement after design has been completed. Restrictions affecting wet areas, plumbing, mechanical systems, flooring, construction hours, contractor requirements, and other building-specific conditions may influence the design from the outset.

Typically seen input may be:

  • New partitions and ceiling fastening system recommendations
  • Wet over dry area limitations
  • HVAC system alteration limitations
  • Tenant Protection Plan special inspection strategizing
  • Presence of asbestos and associated locations
  • New W/D allowed or not.

Building Code Limitations

Governing building codes shall be carefully reviewed by an Architect prior to an apartment purchase being confirmed, assuming a renovation is being considered. Proposed floor plan layout changes should be reviewed as part of a feasibility study. Not all new walls and rooms that an Owner may wish to construct are permitted by the applicable building code.

Minimum Bedroom Size and NYC Bedroom Requirements

When evaluating a proposed layout, minimum bedroom size and NYC bedroom requirements can determine whether an additional bedroom or reconfigured room is feasible. NYC Building Code Chapter 12: Interior Environment establishes requirements for interior space dimensions, room area, natural light, and ventilation.

Under the current 2022 NYC Building Code, habitable spaces generally require a minimum 8-foot plan dimension and at least 80 square feet of net floor area, subject to applicable exceptions. At least one habitable room within a dwelling unit must contain not less than 150 square feet.

These requirements are particularly important when an Owner intends to create an additional bedroom, divide an existing room, or substantially alter the apartment floor plan. A layout that appears workable geometrically may not satisfy the dimensional, light, ventilation, or other requirements applicable to a habitable room.

It is helpful to understand that not all rooms are considered equally. The building code recognizes occupiable and habitable rooms and applies different design requirements. Habitable spaces have specific natural light and ventilation requirements. For apartment Owners, this means that each habitable room shall have an exterior operable window within its footprint, as a starting point.

Read more about our Floor Plan Layout and Feasibility services.

Existing and proposed floor plans converting a one-bedroom apartment into a two-bedroom in the Financial District, new partition walls create the additional bedroom while the kitchen, bathrooms, windows and apartment core stay in place

Existing and Proposed Floor Plan layout for a conversion from one-bedroom to two-bedroom apartment in Financial District, Manhattan.

Legality of Existing Conditions

From time to time, the units that buyers are considering are not in compliance with the building code, and buyers may not be aware of it. The most frequent scenario seen in NYC is the addition of an unauthorized room, often a bedroom that is not of an adequate minimum required area. The second common scenario is the addition of a wall portion that alters the floor plan in a way that doesn’t comply with air and light calculations requiring a window of adequate size for both the fixed and operable panels. Those are conditions that a registered design professional can visually observe.

Existing and proposed floor plans for an apartment renovation in Chelsea, the unpermitted bedroom wall removed in red, the new wall location in green enlarging the bedroom to the code minimum, the open kitchen in light blue and hatched areas outside the scope of work

Existing and Proposed Floor Plan layout showing the removal of an unpermitted bedroom wall and enlargement of the bedroom to meet code-compliant minimum bedroom size requirements in Chelsea, Manhattan.

Non-compliant conditions that are concealed behind the walls and ceilings may surface during the course of a renovation and may require correction depending on the condition, proposed scope, and applicable code. The buildings’ bylaws typically govern who is responsible for the cost of required repairs: the building management or the Co-Op Shareholder/Condo Owner, depending on whether the repair relates to the building structure and systems or to the unit’s interiors and related scope.

Apartment Renovation Cost and Timeline

Apartment renovation cost and timeline shall be accounted for to understand the projected property’s value on the market, and for the proper planning.

Project Costs

Total project cost is comprised of soft and hard costs.

Soft Costs

Soft costs are professional architectural/engineering and interior design fees; DOB processing fees, third party service fees, such as asbestos sampling and testing, DOB progress and special inspection fees, co-op/condo review fees, specialty service such as lighting and acoustical design fees, etc. Soft costs for NYC apartment renovation projects are estimated at 15-25% of construction cost, depending on the size and complexity. Third-party services may amount to another 10% of construction cost.

Hard Project Costs

Hard project costs cover labor and materials. Construction cost is typically expected to start at $350-$450 per SF, on the lower end, and go up from there for medium and high-end projects, topping in the range of $1200 per SF in Manhattan and Brooklyn.

Project Timeline

The timeline heavily correlates with the project’s complexity. For example, a two-bedroom gut renovation shall account for six to eight months from the initial consultation with a selected architect to final completion. This timeline is typically broken into one to two months for design and preparation of construction documentation, one to two months for Co-Op/Condo and DOB approvals, and four months for construction.

NYC DOB approved renovation plans cover sheet for a prewar condo apartment on Wall Street in the Financial District, showing the building's front facade, the NYC DOB approval stamp and the architect's details

NYC DOB approved renovation plans for a prewar condo apartment in Financial District.

NYC DOB approved renovation plans cover sheet for a postwar co-op apartment in Kips Bay, showing the building's front facade, the NYC DOB approval stamp and the architect's details

NYC DOB approved renovation plans for a postwar Co-Op apartment in Kips Bay.

The projections provided exclude Landmarks Preservation Commission (LPC) review. For landmarked properties, interior renovations that require DOB permits generally require LPC review. A Certificate of No Effect is one possible staff-level permit when the work has no effect on protected architectural features. LPC states that complete CNE applications can often be approved within 10 business days; qualifying interior work may be eligible for expedited review.

Apartment Renovation Feasibility Before Closing

An apartment renovation feasibility study is a useful part of the pre-purchase due diligence when a buyer anticipates making significant alterations. Reviewing the proposed scope, building rules, code limitations, existing conditions, anticipated cost and timeline before closing can identify potential constraints while alternatives are still available. Understanding these factors early allows buyers to make a more informed decision about both the apartment and the renovation they envision.

Buying an Apartment You Plan to Renovate?

Before closing, our Architect can review the apartment, the building’s alteration agreement and your planned scope, and outline what is feasible, the projected cost and the timeline.

Contact Us →

Disclaimer

Articles published by Apartment Renovation NYC are provided for general educational and informational purposes only and do not constitute project-specific architectural, engineering, legal, or code-compliance advice. References to products, materials, construction methods, codes, agencies, or third parties should not be construed as an endorsement, approval, or representation that they are appropriate for any particular project.