DO I NEED AN ARCHITECT FOR TILE REPLACEMENT IN NYC?
CONTENT PREPARED AND SERVICES PROVIDED BY FULL-SERVICE NYC-BASED ARCHITECTURAL PRACTICE LENKA ILIC ARCHITECTURE D.P.C.
By Lenka IlicMost NYC property owners assume tile replacement is straightforward work on bathroom or kitchen renovations that any contractor can handle. The question "do I need an Architect for tile replacement" rarely comes up until the DOB shows up at your door.
The core takeaway of this article is in short, yes, a NYC DOB permit is required for most tile removal projects in multiple dwelling units in New York City. An Architect can evaluate the existing conditions and identify the appropriate scope and co-op/condo/DOB approval process.
Bathroom tile replacement may expose underlying wall assemblies that require architectural review before work proceeds.
Why Is Tile Replacement so complicated in NYC?
Many contractors interpret bathroom and kitchen remodels as "direct replacement" jobs if the plumbing fixtures (toilet, sink, bathtub and shower, dishwasher, washer/dryer) stay in their original locations. To clarify, a "direct replacement" job involves only swapping out plumbing fixtures without any tile work included.
For instance, when a sink faucet gets replaced and the new sink connections remain past the tile finish toward the interior space, the tile itself stays undisturbed.
The Legal Reason Why
To be exact, NYC Administrative Code, Title 28, Article 105, 28-105.4.2.1 clarifies that "Any plumbing work other than the repair or replacement of plumbing fixtures, piping or faucets from the exposed stop valve to the inlet side of a trap" does not constitute minor alterations or ordinary repairs. It also excludes removal or cutting of required fire-rated or load-bearing construction from the definition of minor alterations and ordinary repairs, like where tile removal extends into an underlying rated wall or floor assembly.
In other words, opening any fire-resistant rated interior partition requires an architect's involvement. Still, most contractors assume they understand these distinctions and proceed with tile work anyway, completely unaware of the potential building safety issues they're about to create.
Let's talk about tile removal in shower and bathtub areas, floor tile, and tile removal from kitchen walls, and what this means for the dwelling unit where construction occurs and other dwelling units throughout the building. The answer lies in understanding what happens beneath those tiles.
For projects extending beyond tile replacement, our NYC bathroom renovation services address layout, finishes, existing building conditions, and architectural coordination.
What Happens When You Remove Bathroom or Kitchen Tile?
Most New York City condo and co-op building shafts are in bathrooms and kitchens, often clad with tiles. What the tile is attached to, its substrate, is typically cement board and when tile is removed, the substrate that the tile is adhered to is compromised. Kitchen and bathroom shaft walls in multiple dwelling buildings in New York City are typically 2-hour rated and need to be restored to original fire-resistant ratings during the course of a remodel. An Architect provides technical details on how to repair the shaft wall and a NYC DOB registered Special Inspection Agency inspects and approves the repair when it is up to code.
Why does this matter?
Shaft enclosures house utilities that run through the entire building vertically and branch out to units in a multiple dwelling structure feeding into each apartment. Utilities penetrating shaft enclosures require firestopping systems at each location where it penetrates a shaft enclosure to prevent flames, hot gases and smoke spread.
Repairing a rated wall and restoring firestopping at penetrations or joints are related but distinct tasks. The Architect identifies the affected construction and required inspections. Where the work includes qualifying firestop or fire-resistant joint systems, special inspections are required under the applicable code provisions. The 2022 NYC Building Code addresses these inspections in Section 1705.17, Fire-resistant penetrations and joints.
Repairing the fire-rated system is more complex in multiple dwelling buildings and is not as simple a job as a contractor replacing tile and moving on. In New York City it needs authorization from agencies having jurisdiction, and assistance from an Architect and Special Inspection Agency.
Removing bathroom tile compromises substrate and underlying wall assembly behind the finished surface.
Why Tile Removal Can Affect Fire-Rated Shaft Walls
Shaft enclosure is fire-resistance rated to limit the speed and spread of fire and smoke throughout a building. With utilities such as plumbing building risers, including gas pipes, hot and cold water supply pipes, sanitary drain waste pipes, HVAC systems, electrical conduits, etc., run through shaft enclosures.
When tile and cement board are removed, the damage it causes means building shafts are compromised. A compromised fire-rated shaft no longer serves its function of shaft space in terms of protecting against fire spread across adjacent units.
How Serious Is a Compromised Fire-Rated Shaft Wall?
There was such an interesting fact from a CEMCO steel seminar on firestopping, Lenka Ilic our Principal Architect, recently attended which proves our point well, we ask you as a reader to imagine a square room 20 ft x 20 ft x 20 ft that has a pencil hole in a wall.
How long will it take for the smoke to fill the room to a thickness such that you cannot see your hands 18 inches in front of you?
Because the answer was 3 minutes and 40 seconds. According to data from the U.S. Fire Administration, the vast majority of fire fatalities are caused by smoke inhalation rather than direct flames, as toxic gases like carbon monoxide quickly incapacitate victims before the fire ever reaches them. This is a scary point to arrive at without an Architect involved, and the question of whether you need an Architect for NYC renovations becomes self-evident.
Highlighted shaft-wall area shows a shaft wall where the bathroom tile removal is compromising a fire-resistant 2 hour rated assembly.
When Tile Removal Compromises Building Safety of a Fire-Rated Assembly
When tile and cement board are replaced in bathrooms and kitchens, the shaft wall is compromised, because the layers of shaft wall that contribute to its fire-resistant rating are removed. Tile does not contribute to fire rating, but cement board does. A general contractor removing a cement board at rated shaft wall without having adequate direction from an Architect is not good practice and may constitute unauthorized work, in other words, illegal work. There is need for a registered design professional to design the technical detail of how the now compromised shaft wall can be repaired. The shaft wall repair scope of work requires a NYC DOB work permit authorization and an Architect involved. Not understanding the complexity of a building system is dangerous, not just for the tenants of the unit where tile removal is occurring but for the entire building and the public.
Typical bathroom layout illustrating where a shaft wall may be clad with tile in the shower area.
Typical shaft wall assembly layers, including fire-resistance rated tile substrate, cement board illustrating layers considered during bathroom renovation work.
A registered Architect can review the proposed removal, prepare necessary repair details, and coordinate applicable approvals in an efficient manner, as those situations are typical and the technical details needed are standard in the industry. Where filing is required, our NYC DOB filing and permit expediting services coordinate the architectural submission.
Bathroom and kitchen remodel is one of the most prevalent misconceptions when it comes to the need to engage an Architect, and is often misinterpreted by contractors as a “direct replacement” of plumbing fixtures only. Again, direct replacement of any plumbing fixture would not involve tile work. The short answer is yes, consulting with an Architect on tile replacement in bathrooms and kitchens is good practice when planning your remodel or renovation.
What Counts as a "Direct Replacement" in NYC?
Replacing an exposed fixture is different from opening a wall to alter concealed piping or a fixture support system. The scope of the plumbing work and any associated removal should be identified before determining the required approvals.
Bathtub fixture replacements at existing locations must be evaluated in the context of the surrounding wall assembly.
For this project we made the design decision for a tile-free bathroom using an alternative waterproofed wall finish around the bathtub and shower after existing tile was removed.
Some walls in the bathroom are not fire-resistance rated, and plumbing fixtures replacement on those walls would not trigger compromising rated partitions. However, an Architect shall be involved to determine the nature of the partitions.
Floor Tile Removal and NYC Noise Code Requirements
Further, when replacing tile finish at the floor, NYC Noise Code requirements are triggered, which requires an Architect to design the appropriate floor assembly details on the drawing set for Co-op/Condo Board for review and approval prior to any work commencing on the site. Where applicable, NYC Building Code Section 1207 addresses airborne and impact sound transmission. The Architect should also review the building’s flooring requirements before the replacement assembly is selected.
Curated selection of white tile samples for Manhattan and Brooklyn bathroom and kitchen renovations.
Co-op and Condo Requirements Before Tile Replacement
DOB requirements and building approval are separate considerations. We review the building’s alteration agreement and renovation guidelines. These may address flooring, waterproofing, work hours, contractor insurance, and submission requirements. Our co-op and condo board approval assistance begins with reviewing these requirements alongside the proposed work.
Why an Architect is Required for Tile Replacement in NYC
Even seemingly small renovations deserve architectural review before demolition. An Architect evaluates how tile removal may affect wall and floor assemblies, identifies applicable approvals, and defines the architectural scope before contractors price the work.
A general contractor not authorized to practice architecture cannot offer architectural services through a “design-build” package even by employing or subcontracting an Architect. Our article on design-build restrictions for NYC apartment renovations explains these requirements and the direct Owner-Architect relationship.
Before signing a construction agreement, verify who provides the architectural services and how they are contracted. Claims such as “we have an Architect in-house” do not establish a contractor’s authority to offer architectural services. Our guide to identifying misleading design-build advertising explains what to be aware of.
Speak With an NYC Architect Before Starting Tile Replacement
Lenka Ilic showing a bathroom niche renovation and requesting touch up before final completion.
Apartment Renovation NYC is a specialized department of Lenka Ilic Architecture D.P.C. Our Principal Architect, Lenka Ilic, leads the architectural practice and serves as Technical Director of its NYC DOB-registered Special Inspection Agency.
Planning Tile Replacement in NYC?
If you are planning tile replacement, schedule an initial consultation to discuss the existing conditions, proposed scope, and appropriate next steps before demolition.
Schedule an Initial Consultation →Disclaimer
Articles published by Apartment Renovation NYC are provided for general educational and informational purposes only and do not constitute project-specific architectural, engineering, legal, or code-compliance advice. References to products, materials, construction methods, codes, agencies, or third parties should not be construed as an endorsement, approval, or representation that they are appropriate for any particular project.